The forecast that changed the budget

Deterioration usually means more money. Modelled as one system, it meant a better workbank and a lower budget.

A condition curve falling over 40 years and jumping back up at each renewal, with one decision point circled in blue and labelled “one visit, not three”.

Ask most people what a deterioration model is for, and you’ll hear a version of the same answer: it shows that things are wearing out faster than we thought, so we need more money.

That’s the expected outcome of the work. The story I want to tell is a different one.

A rail client asked me to model deterioration. They had the usual starting point: track, ballast and sleepers, each managed as its own asset with its own renewal cycle. Each had a forecast, and each forecast said roughly what you’d expect. Renew this here, renew that there, and so on.

The problem was that the three don’t live separately. Ballast condition affects how the sleepers perform. Sleeper condition affects the track above them. When you renew one in isolation, you either disturb the others unnecessarily or leave them to fail later, in the same place, in a separate and expensive visit.

So we modelled the three together, as one system, and we didn’t stop at the next renewal. We ran it across multiple lifecycles, over more than forty years. That’s a long time to look ahead, but it’s the only horizon that shows how today’s decision echoes through every later one.

The result wasn’t a bigger budget. It was a smarter workbank.

With the system modelled as a whole, the model could show when it made sense to do the work together and when it made sense to wait. Interventions could be lined up so one visit did the job of several. Some work moved earlier, and some moved later or dropped away altogether. The overall budget came down.

I think that’s the part that matters most. Deterioration didn’t mean more money. It meant a better understanding, and the better understanding was worth money.

But a forty-year, multi-lifecycle model across three assets isn’t something you can hand to a room and expect them to follow. It’s rigorous, and it’s also very hard to believe from a table.

So we drew it.

We presented the model as a picture: the condition of each asset over time, the points where they interact, and the moments where a single decision changes everything after it. One of those moments was circled in blue, the point where the old plan and the new one parted company. People could point at it, question it and argue about it. The model went from being something the analysts understood to something the whole team could stand in front of and discuss.

That’s the pairing I keep coming back to. The model gave us something sound to stand on. The picture is what let a roomful of people with different roles, and different worries, see the same decision and agree to make it.

Sometimes the most useful thing a forecast can tell you is where you were about to spend money unnecessarily.

Over to you Where in your own asset base are you renewing things one at a time that really belong together? And has a forecast ever told you something you didn’t expect to hear?

#500words #assetmanagement #visualthinking #richpictures #letstalk